MANILA, Philippines — President Ferdinand Marcos Jr. on Sunday visited Tuba, Benguet to inspect a rock shed project on Camp 6 in Kennon Road.
Accompanied by Baguio City Mayor Benjamin Magalong, Marcos again expressed his dismay after seeing that the P264-million project of the Department of Public Works and Highways (DPWH), completed in November 2024, is in “precarious condition.”
“It’s as if nothing was done,” he lamented in Filipino. “It has eroded. It eroded because the protection wall is very weak.”
Marcos inspects rock shed project in Benguet
“It is very low and very weak that’s why the water can seep in,” he added.
Parts of the structure’s foothold caved in when Typhoon Emong pummeled the region last July.

, This news data comes from:http://pk-alw-lk-ret.771bg.com
- Discaya’s construction companies competed against each other during biddings
- Protesters storm Discaya compound, Sotto calls for calm
- 'New' position being offered to Torre — Palace
- Marcos says commission on DPWH anomalies to be finalized 'very soon,' mum on Magalong participation
- Trough of LPA, ‘habagat’ will bring rain showers, thunderstorms across PH
- Trump moves to limit US stays of students, journalists
- Rep. Tiangco reveals P17B flood control allocations linked to former appropriations chairman Rep. Zaldy Co
- Israel military says controls 40 percent of Gaza City
- Heavy rain falls in parts of Southeast Asia after tropical storm blows into Vietnam Heavy rain falls in parts of Southeast Asia after tropical storm blows into Vietnam
- Indonesia leader orders investigation into driver's protest death